To Do List

Posted: December 10, 2010 in '69, Plans
Tags: , , , , , , ,

So I’m heading back home for Christmas this Wednesday, the15th Dec for 3 and a bit weeks, till the 10th January.

During the holidays I intend to do a fair bit to Wall-e and need to sort out a  few things on Pepper as-well!

To Do:

  • Dismantle and wrap Roll Cage for collection. Wednesday AM.
  • Remove 944 seats from Pepper and take pictures to confirm sale. Wednesday AM
  • Prepare siezed engine for collection, refit pulley and belt, wrap clutch for transport. Wednesday AM
  • Fit freshly charged battery to Wall-E and test fire.
  • Remove steering wheel from Pepper and fit in Wall-e (smaller than standard)
  • Remove sunvisors from Pepper and fit in Wall-e (currently has none)
  • Remove inertia seatbelts from Pepper – probably fit to Wall-e but I do like the current ones 😛
  • Attempt to remove stickers from Pepper and fit to Wall-e
  • Remove Centrelines from Pepper and replace with ordered steels – as soon as they turn up!
  • Remove window winders from Pepper and fit in Wall-e
  • Remove one-piece window seals from Pepper and fit in Wall-e.
  • Remove electric washer pump and resevoir from Pepper, check condition of one in Wall-e.

The only other work that needs doing is dependent on when I can get the window seals fitted – as the current ones are rubbish and are allowing water to pool in the passenger side rear pan. The driver’s side pan which has been newly fitted in the last year or two has not been painted properly, so also needs stripping and painting:

  • Remove carpet from Wall-e
  • Grind surface rust on both pans (mainly passenger side)
  • Strip paint
  • Re-Paint with POR-15 (need to order this!)
  • Refit carpets
  • Have a cuppa.

Not a great deal to do for three weeks!!! So i’ll probably start doing some paint stripping on the exterior on the odd patches where paint is bubbling.

And of course there’s the one thing i’m least looking forward to…

  • Advertise and Sell Pepper. 😦

Leave a comment